Commissioning includes factory testing, site testing and start-up activities, ensuring that the production lines are correctly running and that the final products meets all specified requirements within the operating range.
Due to the coronavirus emergency, starting from spring 2020 the entire Bram-Cor commissioning can be performed remotely, thanks to live audio / video footage made possible by the web.
Bram-Cor systems are first pre-tested in our facility, tested in the presence of the Customer during FAT,and finally tested on site (SAT) under real operating conditions by professional and competent technicians.
Product critical parameters are carefully monitored, as well as fluid flows, pump duties, alarms, valves, emergency power and software modules.
Bram-Cor FAT and SAT protocols provide a complete documentation of testing activities.